County Offices ▸
How Can We Help You? ▸
What We Do ▸
Contact Us ▸
>
County Offices
>
Enviromental Protection Department
>
Pollution Prevention
>
Cabot-Kopppers Superfund Document Search
Cabot-Koppers Superfund Document Search
Search for a document:
All Categories
Cabot Site
Creek Sediments
Feasability Study
Groundwater Investigation
Indoor Dust
Information Requests and Other
Pilot Studies
Progress Reports and Presentations
Remedial Plans Actions
Risk Assessment
Soils/Sediments Investigation
Stormwater
Name
Date
File Size
1658_FDEP Comments on Cabot Revised Groundwater Interceptor Trench Effectiveness Study 11-6-2008 (5).msg
11/06/2008
66KB
1658_FDEP Comments on Cabot Revised Groundwater Interceptor Trench Effectiveness Study 11-6-2008 (2).msg
11/06/2008
66KB
1658_FDEP Comments on Cabot Revised Groundwater Interceptor Trench Effectiveness Study 11-6-2008.pdf
11/06/2008
54KB
1658_Weston Cabot 3rd Quarter 2008 Groundwater Sampling Results -Cabot Site 11-3-2008.pdf
11/03/2008
879KB
1658_USEPA Comments on Suficial Aquifer IRM and Soil Solidification Stabilization Pilot 10-31-2008.doc
10/31/2008
252KB
1658_USEPA Comments on Cabot's Revised Groundwater Interceptor Trench Effectiveness Study 10-31-2008.pdf
10/31/2008
1MB
1658_FL DOH Comments on AMEC Beazer Draft Koppers Offsite Sampling Plan 10-02- 2008 10-22-2008.pdf
10/22/2008
17KB
1658_FDEP Comments on 9-2008 Koppers Surficial Aquifer IRM WP and Soil Solid and Stabilization Pilot 10-22-2008.pdf
10/22/2008
225KB
1658_GRu DNAPL Team Comments on Surficial Aquifer IRM and Soil Stabilization Work Plan Koppers 10-22-2008.pdf
10/22/2008
590KB
1658_ACEPD Comments on GeoTrans Surficial Aquifer IRM and Soil Stabil and Solid Pilot 10-21-2008.pdf
10/21/2008
1MB
1658_GeoTrans September 2008 Monthly Progress Report Koppers 10-19-2008.pdf
10/19/2008
254KB
1658_USEPA Meeting Minutes of Collaborative FS Meeting 4 on 8-13-2008 Koppers 10-16-2008.pdf
10/16/2008
31KB
1658_GRU DNAPL Team Comments on Gradient Cabot Rev Interceptor Trench Invest 10-15-2008.pdf
10/15/2008
2MB
1658_County Atty E-mail to Gainesville Re County Haz Mat Code and Superfund incl T. Zinn Memo 10-14-2008.pdf
10/14/2008
72KB
1658_Alachua County Attorney Memo to BoCC Regarding Clean-up Standards at Koppers Superfund Site 10-13-2008.doc
10/13/2008
50KB
1658_FTS_Comprehensive Groundwater Monitoring Sampling Plan Koppers Site 10-13-2008.pdf
10/13/2008
2MB
1658_ACEPD Comments on Proposed Alternate Locations for Borings Cabot Interceptor Trench Effectiveness Study 10-8-2008.pdf
10/08/2008
18KB
1658_Gradient and Cabot Updated Interceptor Trench Effectiveness Study- Proposed Alternate Boring Locations 10-7-2008.pdf
10/07/2008
265KB
1658_USEPA Comments on Beazer AMEC Relative Absorpiton Factors and MEE Exposure Model Koppers 10-6-2008.doc
10/06/2008
52KB
1658_AMEC Beazer Draft Koppers Offsite Sampling Plan _10-02- 2008.pdf
10/02/2008
3MB
1658_ACHD Comments to ACEPD re Proposed Beazer AMEC Offsite Soil Sampling Plan 10-2-2008.pdf
10/02/2008
501KB
1658_GeoTrans Beazer Surficial IRM and Soil Solidification Stablization Pilot Workplan 9-25-2008.pdf
09/25/2008
9MB
1658_GeoTrans August 2008 Mnthly Prog Rpt Koppers with DNAPL Recovery Wells and Schedule 9-20-2008.pdf
09/20/2008
268KB
1658_GeoTrans Aug 2008 Mnthly Progress Rpt Koppers with DNAPL Recovery Wells and Proj Schedule 9-20-2008.pdf
09/20/2008
268KB
1658_FDEP Additional Comments Human Health Risk Assmt Koppers 9-17-2008.pdf
09/17/2008
53KB
1658_USEPA Minutes GRU EPA ACEPD Meeting 8-28-2008 re Feasibility and GW Issues (Revised Final) 9-16-2008.pdf
09/15/2008
32KB
1658_GRU JEA Minutes and Presentation for 2008-08-28 GRU USEPA_AtlantaMtg 9-16-2008.pdf
09/15/2008
16MB
1658_USEPA Prelim Comments on Beazer Cabot Koppers HHRA Risk Assessment Approach 9-9-2008.doc
09/09/2008
60KB
1658_ACEPD Comments on FS Meeting 3 Notes Summary and Related Issues Koppers Superfund Site 9-3-008.pdf
09/03/2008
2MB
1658_GRU E-mail and USEPA Prelim Meeting Notes GRU USEPA Meeting 8-28-2008 re FS GW Issues 9-3-2008.pdf
09/03/2008
38KB
1658_Cabot Gradient Weston Expanded GW Quality Monitoring Rpt Cabot Site 9-1-2008.pdf
09/01/2008
8MB
1658_GRU and DNAPL Team Presentation to USEPA Re Concerns on FS Progress complete 8-28-2008.pdf
08/28/2008
33MB
1658_FTS 2nd Qtr 2008 Floridan GW Rpt UF Wells FW10B to FW24C and FW4C Lab Data B-1 8-28-2008.pdf
08/28/2008
38MB
1658_FTS 2nd Qtr 2008 Floridan Gw Rpt UF Wells FW10B to FW24C and FW4C Lab Data B-2A 8-28-2008.pdf
08/28/2008
71MB
1658_FTS 2nd Qtr 2008 Floridan GW Rpt UF Wells FW10B to FW24C and FW4C Rpt Figs Tbls only 8-28-2008.pdf
08/28/2008
5MB
1658_FTS 2nd Qtr 2008 Floridan GW Rpt UF Wells FW10B to FW24C and FW4C GW Elev Data Trends C 8-28-2008.pdf
08/28/2008
269KB
1658_FTS 2nd Qtr 2008 Floridan GW Rpt UF Wells FW10B to FW24C and FW4C Lab Data B-2J 8-28-2008.pdf
08/28/2008
17MB
1658_FTS 2nd Qtr 2008 Floridan GW Rpt UF Wells FW10B to FW24C and FW4C Lab Data B-2H 8-28-2008.pdf
08/28/2008
13MB
1658_FTS 2nd Qtr 2008 Floridan GW Rpt UF Wells FW10B to FW24C and FW4C Lab Data B-2G 8-28-2008.pdf
08/28/2008
6MB
1658_FTS 2nd Qtr 2008 Floridan GW Rpt UF Wells FW10B to FW24C and FW4C Lab Data B-2F 8-28-2008.pdf
08/28/2008
26MB
1658_FTS 2nd Qtr 2008 Floridan GW Rpt UF Wells FW10B to FW24C and FW4C Lab Data B-2E 8-28-2008.pdf
08/28/2008
20MB
1658_FTS 2nd Qtr 2008 Floridan GW Rpt UF Wells FW10B to FW24C and FW4C Lab Data B-2D 8-28-2008.pdf
08/28/2008
31MB
1658_FTS 2nd Qtr 2008 Floridan GW Rpt UF Wells FW10B to FW24C and FW4C Lab Data B-2C 8-28-2008.pdf
08/28/2008
57MB
1658_FTS 2nd Qtr 2008 Floridan GW Rpt UF Wells FW10B to FW24C and FW4C Lab Data B-2B 8-28-2008.pdf
08/28/2008
27MB
1658_GeoTrans Beazer Hydrogeology Water Qual Hawthorn Presentation 8-27-2008.pdf
08/27/2008
1MB
1658_GeoTrans Public Notification Flyer of Sentinel Well Drilling 082708.pdf
08/27/2008
465KB
1658_GRU and DNAPL Team Comments on GeotTrans Response to Sentinel Well Workplan 8-19-2008.pdf
08/19/2008
57KB
1658_GeoTrans July 2008 Monthly Progress Report and Schedule Koppers Site 8-18-2008.pdf
08/18/2008
112KB
1658_FDEP Comments on Beazer USEPA Team Revised Draft FS Alternatives Table from Meeting 3_8-18-2008.pdf
08/18/2008
79KB
1658_Weston Cabot 2nd Qtr 2008 Groundwater Sampling Rept Cabot Site Aug 15 2008.pdf
08/15/2008
858KB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
1939 documents found