Search for a document:

 

Name Date File Size
PDF 1658_TetraTech Beaezer Process Area ISGS Phase 1 Characterization Rpt Apps A,C,D,E.pdf 12/09/2013 39MB
PDF 1658_TetraTech Beazer Process Area ISGS Phase 1 Characterization Rpt Phase 1 App B Zip File (Location Ref) 12-9-2013.pdf 12/09/2013 94KB
PDF 1658_FDOH December 2013 Koppers community update re Soils and Dioxins and Zuchini 12-3-13.pdf 12/02/2013 53KB
PDF 1658_FDEP Review of Gradient Cabot_ Revised October 28, 2013 Dye Test Work Plan 11-30-2013.pdf 11/30/2013 69KB
PDF 1658_FDEP Review of Gradient Cabot_ October 29, 2013 Proposed Hawthorn Group Investigation 11-30-2013.pdf 11/30/2013 91KB
PDF 1658_Arcadis Beazer Updated Offiste Soil Contamination and Fingerprinting Report_Nov 28 2013.pdf 11/29/2013 5MB
PDF 1658_Geosyntec Cabot Final ISCO Bench Test Work Plan - CCK Superfund Site 11-20-2013.pdf 11/20/2013 2MB
PDF 1658_FDEP Review of Beazer Institutional Control Implementation and Assurance Plan Koppers 11-18-2013.pdf 11/18/2013 50KB
PDF 1658_FDEP Review and IC Guidance Link re IControl Implementation and Assurance Plan Koppers 11-18-2013.pdf 11/18/2013 66KB
PDF 1658_City and County Press Release Re Pilot Offsite Soil Remediation Action 11-14-2013.pdf 11/14/2013 123KB
PDF 1658_City of Gainesville Memo to City Commission _Complaint re Dust from Koppers Site 11-14-2013.pdf 11/14/2013 512KB
PDF 1658_USEPA Final Comments and Approval 11-06-2013 TetraTech Beazer Pilot Offsite Soil Replacement Plan 11-12-2013.pdf 11/13/2013 41KB
PDF 1658_USEPA Beazer Indentified 10-29-2013 Remediation Parcels West of Beazer Property 11-13-2013.pdf 11/13/2013 411KB
PDF 1658_ACEPD Comments on 11-06-2013 TetraTech Beazer Pilot Plan for Offsite Soil Replacement V1 11-12-2013.pdf 11/12/2013 46KB
PDF 1658_City of Gainesville Comment on TetraTech Beazer 11-06-2013 Pilot Off Property Soil Replacement Plan 11-13-2013.pdf 11/12/2013 27KB
PDF 1658_GRU Comments on Tetra Tech Beazer 11-06-2013 Pilot Plan_ Off-Property Soil Replacement 11-13-2013.pdf 11/12/2013 14KB
PDF 1658_TetraTech Beazer October 2013 Monthly Progress Report 11-08-2013.pdf 11/08/2013 292KB
PDF 1658_Weston Cabot 3rd Quarter 2013 Groundwater Monitoring Report 11-7-2013.pdf 11/07/2013 1MB
PDF 1658_TetraTech Beazer Pilot Plan Offsite Soil Replacement V1 11-06-2013.pdf 11/06/2013 7MB
PDF 1658_FDOH Health Consultation Suface Soils in Surrounding Areas Near Koppers Superfund Site Final 11-4-2013.pdf 11/04/2013 1MB
PDF 1658_Arcadis Beazer Zucchini Dioxin Review_Final with Attachments_10-30-2013.pdf 10/30/2013 181KB
PDF 1658_FDEP Review of Beazer TetraTech 9-20-13 Version 1 Remedial Design Work Plan 10-29-2013.pdf 10/29/2013 27KB
PDF 1658_Gradient Cabot Hawthorn Group Investigation Meeting Follow-up Plans and Figures 10-29-2013.pdf 10/29/2013 2MB
PDF 1658_Gradient Weston Cabot Work Plan For Dye Testing at MW HG-29D 10-28-2013.pdf 10/28/2013 195KB
PDF 1658_USEPA Draft Comments on 9-20-2013 Beazer Tetratech Koppers RD Workplan Version 1 10-25-2013.pdf 10/25/2013 57KB
PDF 1658_Alachua County Chair Letter to Beazer Regarding Relocation Issue Near Koppers chr13 091 9-24-2013.pdf 10/24/2013 435KB
PDF 1658_Beazer 3rd Quarter 2013 Stormwater Report to FDEP 10-23-2013.pdf 10/23/2013 909KB
PDF 1658_ACEPD_GRU_City of Gainesville Comments to Draft 9-20-2013 Beazer Remedial Design Work Plan 10-22-2013.pdf 10/22/2013 159KB
PDF 1658_USEPA DRAFT Comments on Beazer Draft 8-23-2013 Institutional Control Plan 10-17-2013.pdf 10/17/2013 260KB
PDF 1658_TetraTech Beazer September 2013 Monthly Progress Report 10-10-2013.pdf 10/10/2013 540KB
PDF 1658_GRU Comments on the 8-23-2013 Beazer Institutional Control Work plan 10-10-2013.pdf 10/10/2013 42KB
PDF 1658_City of Gainesville Dean Williamson Comments on 8-23-2013 Beazer Institutional Control Work plan 10-9-2013.pdf 10/09/2013 3MB
PDF 1658_Beazer TetraTech Updated Offsite Remediation Zone and Access Map Update 10-8-2013.pdf 10/08/2013 1MB
PDF 1658_ACEPD Comments on 8-23-2013 Beazer Institutional Control Implementation and Assurance Plan 10-3-2013.pdf 10/03/2013 65KB
PDF 1658_FTS Beazer 2013 1st Semianual GW Monitoring Report 10-3-2013.pdf 10/03/2013 8MB
PDF 1658_FTS Beazer 2013 1st SemiAnnual GW Monitoring -Data Validation 10-3-2013.pdf 10/03/2013 34MB
PDF 1658_FTS Beazer 2013 1st SemiAnnual GW Monitoring -Lab Data Rpts 10-3-2013.pdf 10/03/2013 40MB
PDF 1658_Geosyntec Cabot Chapman Ross Information on Background Samples for ISCO Bench Test 9-30-2013.pdf 09/30/2013 46KB
PDF 1658_Gradient Cabot Draft Dye Tracer Study Work Plan 9-24-2013.pdf 09/24/2013 235KB
PDF 1658_Gradient Cabot 2013 Hawthorn Group Investigation_Figures 9-20-2013.pdf 09/20/2013 11MB
PDF 1658_TetraTech Beazer Draft Remedial Design Workplan Cabot Koppers Site 9-20-2013.pdf 09/20/2013 2MB
PDF 1658_TetraTech August 2013 Monthly Progress Report 9-10-3013.pdf 09/12/2013 423KB
PDF 1658_FDEP Review of TetraTech Beazer Planned Offsite Koppers Soil Sampling July 30-31 2013 7-26-2013.pdf 08/26/2013 4MB
PDF 1658_TetraTech Beazer Institutional Control Implementation and Assurance Plan -1st Submittal 08-23-2013.pdf 08/23/2013 2MB
PDF 1658_FDOH August 2013 Koppers community update -Zuchini Warning 8-21-13.pdf 08/21/2013 130KB
PDF 1658_TetraTech Beazer July 2013 Monthly Progress Report 8-9-2013.pdf 08/09/2013 423KB
PDF 1658_Weston Cabot 2nd Qtr 2013 Groundwater Monitoring Report 8-8-2013.pdf 08/08/2013 2MB
PDF 1658_Gradient Cabot Attachment_B_Soil_Groundwater_Samples Data 2013 Hawthorn Group Investigation 8-9-2013.pdf 08/05/2013 34MB
PDF 1658_Gradient Cabot Key Findings Summary Report 2013 Hawthorn Group Investigation 8-5-2013.pdf 08/05/2013 3MB
PDF 1658_Gradient Cabot Attachment A Boring Logs 2013 Hawthorn Group Investigation 8-5-2013.pdf 08/05/2013 496KB
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  31  32  33  34  35  36  37 
1815 documents found