Search for a document:

 

Name Date File Size
PDF 1658_TetraTech Report on FW-32BE Installation Status 2-11-2012.pdf 02/11/2012 560KB
PDF 1658_Arcadis Beazer Clarification to Off-Site Soil Sampling Plan 1-19-2012.pdf 01/19/2012 17KB
PDF 1658_TetraTech December 2011 Progress Report Koppers Site 1-16-2012.pdf 01/16/2012 340KB
PDF 1658_Arcadis Beazer January 2012 Revised Offsite Sampling Plan.pdf 01/13/2012 486KB
PDF 1658_Pat Cline PGC TA Comments on Vapor Intrusion Workplan Cabot Site 1-13-2012012.pdf 01/13/2012 87KB
PDF 1658_Pat Cline Protect Gainesville Citizens Comments on VI Pathway and Cabot VI Workplan 1-13-2012.pdf 01/13/2012 137KB
PDF 1658_Weston Cabot 3rd Qtr 2011 GW Monitoring Rpt 1-9-2012.pdf 01/09/2012 2MB
PDF 1658_Alachua County Press Release Indoor Dust Study Cabot-Koppers Superfund Site 1-5-2012.pdf 01/05/2012 23KB
PDF 1658_FDOH January 2012 Koppers Community Update 1-4-2012.pdf 01/04/2012 44KB
PDF 1658_ACEPD E-mail to County Commission Announcing Indoor House Dust Study- Cabot Koppers Superfund Site 1-4-2012.pdf 01/04/2012 44KB
PDF 1658_Fred Murry Memo to City Commission_Indoor Dust Study Project -Cabot Koppers Superfund Site 1-4-2012.pdf 01/04/2012 702KB
PDF 1658_ACEPD and City of Gainesville Comments on Nov 30 2011 Cabot Draft Vapor Intrusion Workplan Cabot Site 1-4-2012.pdf 01/04/2012 53KB
PDF 1658_TetraTech Beazer November 2011 Monthly Progress Rpt Koppers 12-23-2011.pdf 12/23/2011 337KB
PDF 1658_GRU DNAPL Team ISGS Pre-Demo Testing Additional Information 12-22-2011.pdf 12/22/2011 10KB
PDF 1658_USEPA Draft Comments on Cabot Vapor Intrusion Work Plan Cabot Koppers Site 12-20-2011.pdf 12/20/2011 29KB
PDF 1658_FDOH Health Consult - Sept 2010 Sampling of Soils in SF Neighborhood and North, East and South of Koppers 12-9-2011.pdf 12/09/2011 2MB
PDF 1658_USEPA Comments on Arcadis Beazer Revised Additional Offsite Koppers Sampling 12-6-2011.pdf 12/06/2011 100KB
PDF 1658_TetraTech Beazer Response to EPA SEP92011 Comments_ISGS Workplan 12-2-2011.pdf 12/02/2011 4MB
PDF 1658_ACEPD TFSG Pat Cline Proposed Indoor Dioxin Dust Sampling Implementation Plan and Actions 12-2-2011.pdf 12/02/2011 1MB
PDF 1658_Gradient Cabot Vapor Intrusion Work Plan Cabot Site 11-30-2011.pdf 11/30/2011 5MB
PDF 1658_Gradient Cabot Vapor Intrusion Assessment Workplan Cabot Site 11-30-2011.pdf 11/30/2011 5MB
PDF 1658_Gainesville City Ltr_Ms Osteen_Follow up 17NOV2011 Inquiry Re Fencing Contractors Accessing 437 NW 27th Ave 11-30-2011.pdf 11/30/2011 5MB
PDF 1658_USEPA Letter Response to Gainesville Mayor Lowe 11-8 2011 Ltr to Lisa Jackson EPA re Koppers 11-29-2011.pdf 11/29/2011 356KB
PDF 1658_FDEP Review Offsite Soil Sampling Proposal for Koppers Arcadis 8_31_2011 and 11_21_2011 11-29-2011.pdf 11/29/2011 1MB
PDF 1658_TetraTech October 2011 Monthly Progress Rept Kooppers 11-28-2011.pdf 11/28/2011 333KB
PDF 1658_Gainesville City Letter_Bea Horton_Authorization Approval of Right of Way Use Permit 11-22-2011.pdf 11/22/2011 2MB
PDF 1658_Arcadis Beazer Revised Off-Site Koppers Sampling Locations 11-21-2011.pdf 11/21/2011 593KB
PDF 1658_Gainesville Mayor Lowe USEPA letter - Indoor Dioxin Dust Workplan 11-21-2011.pdf 11/21/2011 113KB
PDF 1658_USEPA Response to County Chair Pinkoson re Indoor Dust Study 11-9-2011.pdf 11/21/2011 892KB
PDF 1658_GRU City of Gainesville Response to Roy Geiersbach re Well Sampling 11-8-2011.pdf 11/08/2011 3MB
PDF 1658_City of Gainesville Mayor Lowe letter to Lisa Jackson USEPA re Cabot Koppers Site 11-8-2011.pdf 11/08/2011 132KB
PDF 1658_TetraTech Beazer FW-32BE Floridan Extraction Well Workplan USEPA Approval 2 11-7-2011.pdf 11/07/2011 49KB
PDF 1658_Tetra Tech Response to GRU Comments on FW32BE Floridan Extraction Well Workplan 11-03-2011.pdf 11/03/2011 74KB
PDF 1658_GRU Comments on TetraTech FW-32BE Workplan 10-25-2011.pdf 10/25/2011 225KB
PDF 1658_TetraTech Sept 2011 Monthly Progress Rpt Koppers 10-21-2011.pdf 10/21/2011 139KB
PDF 1658_FTS 1st SemiAnnual 2011 Groundwater Monitoring Report 10-19-2011.pdf 10/19/2011 13MB
PDF 1658_FTS 1st SemiAnnual 2011 Groundwater Monitoring Report Lab Data Validation 10-19-2011.pdf 10/19/2011 22MB
PDF 1658_FTS 1st SemiAnnual 2011 Groundwater Monitoring Report Lab Data Pt 2 10-19-2011.pdf 10/19/2011 46MB
PDF 1658_FTS 1st SemiAnnual 2011 Groundwater Monitoring Report Lab Data Pt 1 10-19-2011.pdf 10/19/2011 49MB
PDF 1658_County Chair Pinkoson Letter to Lisa Jackson EPA re Support for Indoor Dioxin Dust Sampling Plan chr12 006 10-12-2011.pdf 10/12/2011 826KB
PDF 1658_County Chair Pinkoson Letter to Scott Miller EPA re Support for Indoor Dioxin Dust Sampling Plan chr12 002 10-12-2011.pdf 10/12/2011 817KB
PDF 1658_Alachua County Chair Pinkoson Follow-up Letter to President Obama re Koppers chr 11 117 10-5-2011.pdf 10/05/2011 263KB
PDF 1658_FDEP Comments on Beazer ISGS Hawthorn Workplan 9-30-2011.pdf 09/30/2011 1MB
PDF 1658_TetraTech Beazer FW-32BE Floridan Extraction Well Workplan 9-23-2011.pdf 09/23/2011 1MB
PDF 1658_ACEPD and City Comments on Arcadis Beazer Proposed Additional Offsite Sampling w_Figures 9-22-2011.pdf 09/22/2011 624KB
PDF 1658_TetraTech August 2011 Monthly Koppers Progress Report 9-19-2011.pdf 09/19/2011 220KB
PDF 1658_Cabot Transmittal of Hawthorn Well Installation Sched Cabot Site 9-14-2011.pdf 09/14/2011 42KB
PDF 1658_Cabot Hawthorn Well Installation Sched Cabot Site 9-14-2011.pdf 09/14/2011 51KB
PDF 1658_Gainesville City Pearson Response to Bea Horton re Stormwater Drainage 9-15-2011.pdf 09/05/2011 2MB
PDF 1658_USEPA September 2 2011 Comments on Upper Hawthorn Group ISGS Pilot 9-2-2011.pdf 09/02/2011 525KB
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  31  32  33  34  35  36  37 
1835 documents found