County Offices ▸
How Can We Help You? ▸
What We Do ▸
Contact Us ▸
>
County Offices
>
Enviromental Protection Department
>
Pollution Prevention
>
Cabot-Kopppers Superfund Document Search
Cabot-Koppers Superfund Document Search
Search for a document:
All Categories
Cabot Site
Creek Sediments
Feasability Study
Groundwater Investigation
Indoor Dust
Information Requests and Other
Pilot Studies
Progress Reports and Presentations
Remedial Plans Actions
Risk Assessment
Soils/Sediments Investigation
Stormwater
Name
Date
File Size
1658 FTS 2015 First Semi-Annual Comprehensive GWM Report Lab Data 1.20.16.pdf
01/20/2016
95MB
1658 FTS 2015 First Semi-Annual Comprehensive GWM Report Validation 1.20.16.pdf
01/20/2016
48MB
1658 EPA Approval letter for Cabot Confirmation Sediment Sampling Work Plan 1-15-16.pdf
01/15/2016
205KB
1658 Health Consultation FDOH Soil Gas and Indoor Air Investigations Cabot Carbon 1-12-16.pdf
01/12/2016
4MB
1658 Tetra Tech December 2015 Monthly Progress Report 1-8-16.pdf
01/08/2016
221KB
1658 Cabot Gradient Monthly Progress Report December 2015 1-7-16.pdf
01/07/2016
127KB
1658 Cabot Gradient Monthly Progress Report November 2015 12-16-2015.pdf
12/16/2015
88KB
1658 Cabot Gradient Floridan Well CFW-1 Sampling Results 12-14-15.pdf
12/14/2015
724KB
1658 Tetra Tech November 2015 Monthly Progress Report 12-10-2015.pdf
12/10/2015
212KB
1658 Cabot Gradient Comments on Beazer Monitoring Well HG-29D 11-25-15.pdf
11/25/2015
2MB
1658 Cabot Gradient Monthly Progress Report October 2015 11-10-2015.pdf
11/10/2015
57KB
1658 Tetra Tech October 2015 Monthly Progress Report 11-10-2015.pdf
11/10/2015
228KB
1658 Daily Reports Cabot-Koppers ISGS Process Area for October 2015 10-31-2015.pdf
10/31/2015
1MB
1658 FDEP Comments on Work Plan for Confirmation Sediment Sampling in Springstead and Hogtown Creeks 10-30-15.pdf
10/30/2015
1MB
1658 Cabot Gradient Interim Report Remedial Investigation and Focused Feasibility Study 10-20-15.pdf
10/20/2015
18MB
1658 Cabot Gradient Confirmation Sediment Sampling Work Plan 10-16-15.pdf
10/16/2015
2MB
1658 Cabot GRU Letter to City Status of Floridan Aquifer Monitoring Well Drilling at Cabot Site 10-15-15.pdf
10/15/2015
42KB
1658 Tetra Tech September2015 Monthly Progress Report 10-8-2015.pdf
10/08/2015
226KB
1658 Cabot Gradient Monthly Progress Report September 2015 10-7-2015.pdf
10/07/2015
134KB
1658 Daily Reports Cabot-Koppers ISGS Process Area for September 2015 09-30-2015.pdf
09/30/2015
1MB
1658 ACEPD Letter to Sharon Sheets Koppers Off-site Monitoring Well Data, Well HG-24S Located on NW 30th Avenue 9-25-15.pdf
09/25/2015
60KB
1658 Cabot Gradient Former Processing and Storage Area Investigation Results 9-25-2015.pdf
09/25/2015
621KB
1658 Tetra Tech Field Test of Organoclay Addition to ISGS Injectate 9-15-2015.pdf
09/15/2015
6MB
1658 Tetra Tech August 2015 Monthly Progress Report 9-10-2015.pdf
09/10/2015
219KB
1658_Tetra Tech August 2015 Monthly Progress Report 9-10-2015.pdf
09/10/2015
219KB
1658 Daily Reports Cabot-Koppers ISGS Process Area for August 2015 08-31-2015.pdf
08/31/2015
1MB
1658_Black Veatch Review of Concerns Regarding Mobilization of DNAPL by ISGS Injection 8-28-2015.pdf
08/28/2015
123KB
1658 Black and Veatch Review of Concerns Regarding Mobilization of DNAPL by ISGS Injection 8-28-15.pdf
08/28/2015
123KB
1658 Tetra Tech October 2014 Monthly Progress Report (Revised) 8-26-2015.pdf
08/26/2015
353KB
1658 _Tetra Tech October 2014 Monthly Progress Report (REVISED) 8-26-2015.pdf
08/26/2015
353KB
1658_TetraTech Pre-Design Investigation Work Plan Design Track 2 Version 2 8-25-2015.pdf
08/25/2015
3MB
1658_TetraTech Response to EPA Comments on Pre-Design Investigation Work Plan Design Track 2 8-25-2015.pdf
08/25/2015
133KB
1658 Tetra Tech Pre-Design Work Plan Design Track 2 Version 2 8-25-2015.pdf
08/25/2015
3MB
1658 Tetra Tech Response to EPA Comments on Pre-Design Work Plan Design Track 2 8-25-2015.pdf
08/25/2015
133KB
1658_Cabot Response to EPA letter requesting a Workplan for the Hawthorn groundwater remediation 8-20-2015.pdf
08/20/2015
659KB
1658_GRU Concerns re ISGS Mobilization Memo 2015-08-17 Final.pdf
08/17/2015
422KB
1658_GRU DNAPL Team Copy of DNAPL Product Thickness Data Aug-rev 8-17-2015.xlsx
08/17/2015
254KB
1658_Environmental Standards Groundwater Monitoring Quality Assurance Project Plan 8-10-2015.pdf
08/10/2015
3MB
1658_TetraTech Beazer July 2015 Monthly Progress Report Koppers 8-10-2015.pdf
08/10/2015
312KB
1658 Environmental Standards Quality Assurance Project Plan for Groundwater Monitoring 8-10-15.pdf
08/10/2015
3MB
1658_FDEP Follow Up Comments and Gradient Cabot Questions for Sediment sampling in Hogtown and Springstead Creeks 8-6-2015.pdf
08/05/2015
74KB
1658_Josh Hayes JM Waller Field Notes on ISGS Process Area 7-7-2015 to 7-31-2015 8-3-2015.pdf
08/03/2015
1MB
1658_Beazer 2nd Quarter 2015 Stormwater Discharge Report to FDEP 7-31-2015.pdf
07/31/2015
3MB
1658_Weston Cabot 2nd Quarter 2015 Cabot Site GW Monitoring Report 7-28-2015.pdf
07/28/2015
2MB
1658_TetraTech Beazer Remedial Action Completion Report Off- Property Soils V1 Rept and Appxs A,B 7-28-2015.pdf
07/28/2015
4MB
1658_TetraTech Beazer Remedial Action Completion Report Off- Property Soils V1 Appx C 7-28-2015.pdf
07/28/2015
83MB
1658_TetraTech Beazer Remedial Action Completion Report Off- Property Soils V1 Appx D 7-28-2015.pdf
07/28/2015
968KB
1658_TetraTech Beazer Remedial Action Completion Report Off- Property Soils V1 Appxs E -H 7-28-2015.pdf
07/28/2015
14MB
1658_TetraTech Beazer Remedial Action Completion Report Off- Property Soils V1 Appx J 7-28-2015.pdf
07/28/2015
2MB
1658_TetraTech Beazer Remedial Action Completion Report Off- Property Soils Appx I Dust Noise Met Data V 1 7-28-2015.pdf
07/28/2015
14KB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
1939 documents found